THE BUILDING OF THE NEW FIRE STATION FOLLOW THE STORY OF THE BUILDING OF THE NEW STATION. BUILT 150 YARDS AWAY ON THE OTHER SIDE OF CORONATION ROAD CAR PARK PICTURES FROM THE CLEARED SITE TO THE FINISHED PRODUCT
THE ORIGINAL SITE - LEVELLED AND READY FOR THE START
EQUIPMENT AND MATERIALS ARRIVE - THE OLD STATION ROOF IN THE BACKGROUND.
PILING TO STRENGTHEN THE SOFT GROUND
THE SITE - LOOKING TOWARDS THE CHATEAU BELLEVUE HOTEL
PILING COMPLETE
SHUTTERING FOR THE FOUNDATION CONCRETE
POURING CONCRETE - STEEL REINFORCING IN THE FOREGROUND
APPLIANCE ROOM FLOORS CONCRETED
STEEL FRAME IN PLACE AND BRICK WALLS STARTED
THE ACCOMODATION AREA
THE APPLIANCE ROOM END GABLE WALL ALMOST COMPLETE
WINDOWS BEING INSTALLED IN THE CONTROL ROOM
THE MAIN PEDESTRIAN ENTRANCE - LOOKING THROUGH THE MUSTER BAY INTO THE APPLIANCE ROOM
THE DRILL TOWER INSTALLED - THE REAR DRILL YARD NOT QUITE READY FOR TARMAC
THE ROOF ON - STATION OFFICER JOE SEAFORD HAVING A LOOK AROUND
THE FINISHED PRODUCT APPLIANCES MOVED - ALL SPIC AND SPAN AND READY TO GO